Project Name | Exhibition Hall of Jingyu Industry Co., Ltd | Project Introduction | 1.5 conventional LED screens 2.1 three side immersion 3.1 LCD screens 4.2 column screens |
---|---|---|---|
Project Date | 2022.07 | Equipment used | F2、Kapollo |
Project Location | Shanghai | Project Requirements | 1. One computer is centrally controlled to ensure smooth playback without jamming. 2. Play through the tablet control, switch materials and plans. 3. The display effect should be clear, and the screen should have a good picture taking effect. |
View all cases
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Zhejiang Jiande daciyan Service Center
Project Name:Zhejiang Jiande daciyan Service Center
Project Date:2021.09
Project Location:Jiande City, Zhejiang Province
Project Introduction:Screen module, P2, l-fold
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
Gansu Baiyin cultural and creative center
Project Name:Gansu Baiyin cultural and creative center
Project Date:2020.12
Project Location:Baiyin City, Gansu Province
Project Introduction:1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen.
-
Weihai Free Trade Zone Customs exhibition hall
Project Name:Weihai Free Trade Zone Customs exhibition hall
Project Date:2021.03
Project Location:Shandong
Project Introduction:1. Immersive 4-sided screen 2 Front screen: 1792 * 1536 left and right screens: 1024 * 1536 ground screen: 1792:1024
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.