Project Name | Industrial and Commercial Bank of China Guizhou New Sub branch Hall | Project Introduction | 1. Two U-shaped strip screens on the front 2. One interactive ground screen. |
---|---|---|---|
Project Date | 2022.07 | Equipment used | KS9000、KS928*2、S4*12、G612F*238 |
Project Location | Ninghe District, Tianjin | Project Requirements | 1. Centralized control of one server. 2. Smooth playback without jamming, clear and smooth picture quality. 3.8k resolution point to point playback. |
View all cases
-
Henan 10000 mu Lotus Garden
Project Name:Henan 10000 mu Lotus Garden
Project Date:2021.06
Project Location:Puyang City, Henan Province
Project Introduction:1. Use P2 dual input module to splice into tunnel screen
-
Chutian medicine exhibition hall
Project Name:Chutian medicine exhibition hall
Project Date:2021.11
Project Location:Ningxiang City, Hunan Province
Project Introduction:4K large screen
-
Beijing army aviation academy
Project Name:Beijing army aviation academy
Project Date:2020.01
Project Location:Beijing
Project Introduction:P3,4608×832
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Ziyang Yagu science and Innovation Park
Project Name:Ziyang Yagu science and Innovation Park
Project Date:2021.03
Project Location:Sichuan
Project Introduction:The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point.
-
Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Name:Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Date:2020.07
Project Location:DaQing
Project Introduction:P4, 12320*1520, 13 screens open at the same time, and switch and play
-
Weifang xiguanting village exhibition hall
Project Name:Weifang xiguanting village exhibition hall
Project Date:2020.11
Project Location:Weifang, Shandong
Project Introduction:One arc giant screen, seven long vertical screens, and three large screens of sand table.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen